    #91
    Contact info of dealer

    Originally posted by KRenn
    Gross cost at $4.41 a watt in California for SunPower? That's ridiculously low priced. Seems some installers really are cutting price to get business in the door.
    These prices seem good. Can you please share the details via pm. Thx

    Comment

    • Ionizer
      Junior Member
      • May 2013
      • 26

      #92
      Tried to PM those that inquired, but my posts are under 10

      Comment

      • Ionizer
        Junior Member
        • May 2013
        • 26

        #93
        I have 2 suppliers that provided me with this quote and we have signed with the closest to us.. We are awaiting permits now..

        Comment

        • Ionizer
          Junior Member
          • May 2013
          • 26

          #94
          We had two Sunpower suppliers quote the same price (Price matched)
          We had a total of 11 System suppliers quote us:

          OUR Final deal was:

          Utility = SCE
          (24) Sunpower X21-SPR345E-WHT-D Panels
          (1) SMA SB8000US inverter
          System Cost = $36,500
          CSI Rebate = $1450 Estimate (probally a little high)
          After rebate = $35,050
          Tax Credit = $10,515.00
          Net Cost = $24,535.00

          DC STC Rating = 8280 kW
          Current annual usage = 13,100 kWh

          Gross Cost/kW DC = $4.41
          Net Cost/kW DC = $ 2.96

          Concrete Tile roof / Through attic install with a change to 3 Vents (low profile)
          Pappered and double flashed.
          3 vents replaced with low rise vents below panels
          All wiring within structure and SBA mounted in garage.
          NO panel change out. Already at 225.
          25yr monitoring with 10 Yr. whole system/roof warranty.

          Estimated completion is 9/01/2013 to 9/15/2013

          Comment

          • PenguinSolar
            Solar Fanatic
            • Jul 2013
            • 110

            #95
            Originally posted by Ionizer
            I have 2 suppliers that provided me with this quote and we have signed with the closest to us.. We are awaiting permits now..
            Do you mind sharing? Think it'd be useful as others in SoCal are still shopping .

            For the CSI Rebate, think you can just plug your numbers into the CA Go Solar calculator. I find it helps keep some of the vendors "honest" .

            Thanks!

            Comment

            • russ
              Solar Fanatic
              • Jul 2009
              • 10360

              #96
              Originally posted by Ionizer
              We had two Sunpower suppliers quote the same price (Price matched)
              We had a total of 11 System suppliers quote us:

              OUR Final deal was:
              Thanks for the information - many will find it useful!

              Russ
              [SIGPIC][/SIGPIC]

              Comment

              • frizzlefry
                Member
                • Dec 2012
                • 67

                #97
                Wow... 11 is alot. We're expecting our panels to arrive middle of Aug. It's been a long wait but hopefully this will happen soon.

                I PM'd everyone that requested the info from this thread.... if it didn't go, don't know what to say. But I went with Sullivan Solar Power. They are primarily based out of San Diego but have remote sales offices. It was between them and a more Orange County centric company called Ameco. After I notified Ameco of my current offer through Sullivan, they wouldn't budge and came off a bit arrogant stating that Sullivan was "only a C-10" contractor and did not have a true "solar" license. Both are reputable from online reviews, but after my last email exchange with my contact at Ameco, I would rather not recommend them. Would I recommend Sullivan? Yes and no. Initial signing process was good, but I am still trying to confirm for the last 2 weeks with one person whether or not the CSI rebate was reserved. Searching on the CSI tracker site for current projects, I couldn't find ours listed. Don't know why.... anyone?


                Originally posted by Ionizer
                We had two Sunpower suppliers quote the same price (Price matched)
                We had a total of 11 System suppliers quote us:

                OUR Final deal was:

                Utility = SCE
                (24) Sunpower X21-SPR345E-WHT-D Panels
                (1) SMA SB8000US inverter
                System Cost = $36,500
                CSI Rebate = $1450 Estimate (probally a little high)
                After rebate = $35,050
                Tax Credit = $10,515.00
                Net Cost = $24,535.00

                DC STC Rating = 8280 kW
                Current annual usage = 13,100 kWh

                Gross Cost/kW DC = $4.41
                Net Cost/kW DC = $ 2.96

                Concrete Tile roof / Through attic install with a change to 3 Vents (low profile)
                Pappered and double flashed.
                3 vents replaced with low rise vents below panels
                All wiring within structure and SBA mounted in garage.
                NO panel change out. Already at 225.
                25yr monitoring with 10 Yr. whole system/roof warranty.

                Estimated completion is 9/01/2013 to 9/15/2013

                Comment

                • csriram45
                  Member
                  • Apr 2011
                  • 46

                  #98
                  Pm info pls

                  Can you send me details? I am in northern ca. I hope they can do an install here.

                  Comment

                  • Ionizer
                    Junior Member
                    • May 2013
                    • 26

                    #99
                    Those that have asked,
                    One of the two that quoted was RCC Solar.
                    Though the one we went with was SolarMax due to closer and we have 2 friends that also went with SolarMax and the install went well.

                    Just got an email from one of the other SunPower dealers (360Solar) that is now willing to price match (little late). I did get a quote from Sullivan which stated they would price match, but never put it in writing. Their original quote was close @ $4.55W - $37,675.00

                    Update:
                    So far SolarMax has been great, but a little slower then I expected. About a month in now. We spent a whole week in designing/re-designing the location of the panels until I was pleased before permits were pulled. I know the rep has a lot to do with the whole process, and we got one that appears on top of it all, and has bent over backwards to get the design right. Luckily he was referred.

                    Comment

                    • frizzlefry
                      Member
                      • Dec 2012
                      • 67

                      Looks like X21-345 panels are backlogged. 15 wk lead time. I'm looking at a new ship date of mid to late Oct. Just checked on lead times for X21-335 (all black) and it's 2-3 wks. Now considering the 335... time to run some more #/$ analysis...

                      Comment

                      • Ionizer
                        Junior Member
                        • May 2013
                        • 26

                        Originally posted by frizzlefry
                        Looks like X21-345 panels are backlogged. 15 wk lead time. I'm looking at a new ship date of mid to late Oct. Just checked on lead times for X21-335 (all black) and it's 2-3 wks. Now considering the 335... time to run some more #/$ analysis...
                        Ouch! I know they ordered mine about 3 weeks ago. Going to make the call now and find out where they are. I'm crossing my fingers the story is not the same. OUCH, sorry to hear this.

                        Comment

                        • santaanatrail
                          Junior Member
                          • Jul 2013
                          • 8

                          just got a quote for a sunpower system

                          Tell me what you all think.
                          it's a cash deal. So far just one quote but expecting another quote from another vendor tomorrow.

                          sunpower system
                          20 pieces x20/250 panels
                          One SPR-5000p-TL (240)
                          5 kw (dc) 4.4 kw (ac)
                          1st production est. 7773 kwh

                          For $27,500. (before rebates and tax credit)

                          what do you think? The vendor is out of north county San Diego area.

                          I'm located SoCal and the vendor told me if I sign today it'll take 2 to 3 months before they can start.

                          Comment

                          • Ionizer
                            Junior Member
                            • May 2013
                            • 26

                            Originally posted by santaanatrail
                            Tell me what you all think.
                            it's a cash deal. So far just one quote but expecting another quote from another vendor tomorrow.

                            Sunpower system
                            20 pieces x20/250 panels
                            One SPR-5000p-TL (240)
                            5 kw (dc) 4.4 kw (ac)
                            1st production est. 7773 kwh

                            For $27,500. (before rebates and tax credit)

                            what do you think? The vendor is out of north county San Diego area.

                            I'm located SoCal and the vendor told me if I sign today it'll take 2 to 3 months before they can start.
                            $27,500.00 / 5000 watts =
                            $5.50 a watt and with older panels. These older panels are lower wattage then the newer x21's or e20's (20 - X20 panels 250 watts = 15 - X21 black panels 335 watts or 15 - e20 327 watts)
                            Sounds a little high for dated material, and why waste the extra roof space when you can place 15 x21's or 15 xe20's for the same $ or less?

                            Comment

                            • santaanatrail
                              Junior Member
                              • Jul 2013
                              • 8

                              They were pushing for x20...should have guessed. I asked about x21 and told me the price would jump. didn't give me the exact figure though. just a start. I am contacting several others sunpower and non sunpower vendors. thx for the info though. exactly what I was hoping for from the forum.

                              Comment

                              • Niceguy
                                Junior Member
                                • Jul 2013
                                • 7

                                Originally posted by Ionizer
                                We had two Sunpower suppliers quote the same price (Price matched)
                                We had a total of 11 System suppliers quote us:

                                OUR Final deal was:

                                Utility = SCE
                                (24) Sunpower X21-SPR345E-WHT-D Panels
                                (1) SMA SB8000US inverter
                                System Cost = $36,500
                                CSI Rebate = $1450 Estimate (probally a little high)
                                After rebate = $35,050
                                Tax Credit = $10,515.00
                                Net Cost = $24,535.00

                                DC STC Rating = 8280 kW
                                Current annual usage = 13,100 kWh

                                Gross Cost/kW DC = $4.41
                                Net Cost/kW DC = $ 2.96

                                Concrete Tile roof / Through attic install with a change to 3 Vents (low profile)
                                Pappered and double flashed.
                                3 vents replaced with low rise vents below panels
                                All wiring within structure and SBA mounted in garage.
                                NO panel change out. Already at 225.
                                25yr monitoring with 10 Yr. whole system/roof warranty.

                                Estimated completion is 9/01/2013 to 9/15/2013