We are installing our first system using M215 Enphase micronverters
the 6 strings will go to 4 junction boxes on 4 roofs and go to a combiner box and to the main service panel
I was told by AC disconnect is not required by a solar material dealer and confirmed it with enphase,
I keep seeing AC disconnect on microinverter install and Solar warning labels made for that ... make me question that again
so can you guys please confirm if I do not need AC disconnect for the M215 install?
2nd question, if I dont need an AC disconnect... Can I connect the string directly to the main service panel with a 20amp fuse?
I have 2 x200 amp service panels with many empty spots
3rd question does NY - PSEG (my electric company) inspect my system before allowing me turning it on?
Anyone know which lables I need and where for such an install?
the 6 strings will go to 4 junction boxes on 4 roofs and go to a combiner box and to the main service panel
I was told by AC disconnect is not required by a solar material dealer and confirmed it with enphase,
I keep seeing AC disconnect on microinverter install and Solar warning labels made for that ... make me question that again
so can you guys please confirm if I do not need AC disconnect for the M215 install?
2nd question, if I dont need an AC disconnect... Can I connect the string directly to the main service panel with a 20amp fuse?
I have 2 x200 amp service panels with many empty spots
3rd question does NY - PSEG (my electric company) inspect my system before allowing me turning it on?
Anyone know which lables I need and where for such an install?