An mppt charge controller has specificcations as well and they will fry if you connect mor than they are speced for.
if you think you can connect a 2billion watt array to a residential inverter and it will just clip then you are likely a good candidate for purchase of a bridge.
clipping is where an inverter has more input than it can handle but still within the operating range.
The optimizers have an operating range, when yu are outside of that two things happen, your warranty is voided, and the second, you risk failure. The further outside of the iperating range the higher the risk of failure, at some point it becomes certain.
if you think you can connect a 2billion watt array to a residential inverter and it will just clip then you are likely a good candidate for purchase of a bridge.
clipping is where an inverter has more input than it can handle but still within the operating range.
The optimizers have an operating range, when yu are outside of that two things happen, your warranty is voided, and the second, you risk failure. The further outside of the iperating range the higher the risk of failure, at some point it becomes certain.