    Originally posted by Ampster
    If I understand the concept, it moves the vent so that it does not exit under the panels. It is probably quicker and less expensive than moving the vent if the attic is even accessible.
    I'd suggest it allows movement of the outlet or the end of the vent to a place that's potentially "better" and probably more AHJ friendly, but consideration of the consequences of the move and the location of the end of the vent are things that need consideration but are often sometimes not thought about.

    Comment

    • Mike90250
      Moderator
      • May 2009
      • 16020

      #32
      When I built my house, we combined, in the attic, most of the vent stacks, but included clean out "Y's", because trick # 2 for plumbers, is to snake down the roof vent, instead of spilling black water all over the floor of the house.
      Powerfab top of pole PV mount (2) | Listeroid 6/1 w/st5 gen head | XW6048 inverter/chgr | Iota 48V/15A charger | Morningstar 60A MPPT | 48V, 800A NiFe Battery (in series)| 15, Evergreen 205w "12V" PV array on pole | Midnight ePanel | Grundfos 10 SO5-9 with 3 wire Franklin Electric motor (1/2hp 240V 1ph ) on a timer for 3 hr noontime run - Runs off PV ||
      || Midnight Classic 200 | 10, Evergreen 200w in a 160VOC array ||
      || VEC1093 12V Charger | Maha C401 aa/aaa Charger | SureSine | Sunsaver MPPT 15A

      solar: http://tinyurl.com/LMR-Solar
      gen: http://tinyurl.com/LMR-Lister

      Comment

      Working...