Well, since it looks like you have a simple grid tie inverter, after the $600 , 200A Transfer switch is installed, the easiest way is to set the generator to 61Hz That way the solar will never be able to qualify it and life should be good.
Or it can be accomplished with a pair of transfer switches.
That's why planning ahead is critical, building up stuff piecemeal gets expensive fast.
But realize there will be a 30 second to 2 minute blackout while the generator starts up and prepares to take the load
Or it can be accomplished with a pair of transfer switches.
That's why planning ahead is critical, building up stuff piecemeal gets expensive fast.
But realize there will be a 30 second to 2 minute blackout while the generator starts up and prepares to take the load
Comment