This is an old thread but thought I'd see if I can get a reply. I have a similar situation, running an EGC back to the inverter from the combiner, redundant green wire in EMT, and a GEC from the racking frame to the house ground rod. My question is whether they should be tied at the roof.
Thanks
Thanks
Comment