finally started my install at the beach in Montauk new York... the rails are installed, as is the piping for the wiring... next week (weather permitting) the panels go up, and we should be online shortly after that... the install is 28 SP 335's, with solaredge equipment.. I reckon with conservation of led lights, shutting down '2' fridges when not in use (sept-may) etc etc... these 28 panels should provide us 100% of our needs...