Looks like Fronius has figured out what I did in 2013. They say the E-W system is actually cheaper, I
figured it might be 5% more expensive per KWH. I don't see an attempt to get a flat as possible curve
over the day, or discussion of reduction in the resulting peak power (compared to the simple total of
the panel ratings) versus the inverter over paneling rating.
What they don't mention, is the benefits under clouds. That was the starting point here, more panels
under clouds make more power. Having concluded that, the issue then is what about when there are
minimal clouds? That brought the E-W orientation, to avoid simply throwing away the available energy
on clipping under minimal clouding. I think the argument for E-W gets stronger with more clouds or
overcast, but it is hard to put numbers on this.
Certainly a 2 sided array will be the cheapest. But I don't see a way to make seasonable tilt changes,
and it requires twice as large an unshadowed area. To minimize snow clearing efforts, and trying to
avoid a lot more tree cutting, I am moving toward single orientation arrays facing varied directions
across a common clearing, and easy tilt changes. Bruce Roe
Most Popular Topics
Collapse
Sun hours
Collapse
X
-
Last edited by bcroe; 07-18-2018, 06:52 PM. -
Here is a Fronius technical paper that discusses concepts involved. Although not exact match to what I am doing, it does discuss the shoulder array concept.
SE_TA_Efficient_East_West_orientated_PV_systems_with_one_MPP_Tracker_EN (2).pdf
Leave a comment:
-
It just so happens that my Fronius string inverters will accept a fourth string without exceeding the max current limitation. The Fronius units are sturdy with an active cooling system.
Finally I'm on a net billing system which allows me to sell all my excess at wholesale rates, currently around $0.075 per kWh. So by doing the work myself and getting an especially good deal on Trina 245's my ROI is relatively short.
Leave a comment:
-
Hung the under structure today and the array is starting to take shape......
IMG-2585.JPGIMG-2586.JPGIMG-2587.JPGIMG-2588.JPG
Thanx.
J.P.M.Leave a comment:
-
Hung the under structure today and the array is starting to take shape......
IMG-2585.JPGIMG-2586.JPGIMG-2587.JPGIMG-2588.JPGLeave a comment:
-
Here's a link to a GSES Technical Paper indicating a DC/AC oversizing ratio of 150% will maximize benefits. Hope they're right.
https://www.gses.com.au/wp-content/u...Oversizing.pdf
If you look closely at the middle pic....the close up of the 3" top cap.... you will see an object in the background below. Kudos to anyone who can identify the device. It is a hydraulic ram jet used to pump water without electricity. The power of water running down hill in a larger pipe was used to pump water uphill in a smaller pipe. Very popular in the farming community before electrification.
The device belonged to my spouse's grandfather. It pumped water from a spring a hundred yards from the house to a holding tank in the attic of their home. They had running water when all their neighbors were still using outhouses and hand powered sink pumps.Last edited by DanS26; 07-17-2018, 05:39 PM.Leave a comment:
-
Here are pics of the under-structure of the shoulder array......
IMG-2574 (1).JPGIMG-2575.JPGIMG-2576.JPG
I built this under-structure in my workshop this winter. First off that is 2" x 2" x 3/16" aluminum angle 6061-T6. All bolts, taps and washers are stainless steel.
If you look at the middle pic you will see an IronRidge 3" Top Cap.......that was the basis of the design idea. Maybe IronRidge would be interested in my re-purposing their Top Caps?
It will all come clear to everyone once I mount the structure. The bracing is amazingly simple, which I will show later.Leave a comment:
-
We get tornadoes, but residential stuff isn't intended to withstand a direct hit. If that happened, the
panels (a quarter of the investment) might be damaged, but likely ground supports and underground
would still be intact. In a video of a seriously damaged area, I noted a car lift identical to mine (bolted
to concrete) standing intact.
Lets see the hardware to mount a 2 sided array. Likely the wind effects are about the same as single.
Bruce RoeLeave a comment:
-
We get tornadoes, but residential stuff isn't intended to withstand a direct hit. If that happened, the
panels (a quarter of the investment) might be damaged, but likely ground supports and underground
would still be intact. In a video of a seriously damaged area, I noted a car lift identical to mine (bolted
to concrete) standing intact.
Lets see the hardware to mount a 2 sided array. Likely the wind effects are about the same as single.
Bruce RoeLeave a comment:
-
All five posts are now set and waiting for concrete to cure....used 25 80lb bags of Sackrete...no water mixing required....just poured the dry mix in the hole then added 3 1/2 quarts of water on top of each bag.....then tamp...then repeat. Very quick and easy.
Shoulder Array #2.JPG
Posts are 3" Schedule 40 galvanized pipe set 48" deep in 12" holes with rebar. Weight capacity should be no problem. Only serious threat to the array complex would be a tornado.Last edited by DanS26; 07-14-2018, 02:38 PM.Leave a comment:
-
Setting posts.....my method. Five to six bags of Sackrete per hole dry then just add water.
Rebar inserted through pipe about 20" from bottom of hole which is 48" deep.
Post Set.JPG
Will use a laser level to align the remaining four posts.Leave a comment:
-
Setting posts.....my method. Five to six bags of Sackrete per hole dry then just add water.
Rebar inserted through pipe about 20" from bottom of hole which is 48" deep.
Post Set.JPG
Will use a laser level to align the remaining four posts.
Any attention to external loadings with respect to design ?
Don't forget to dome the concrete to help avoid ponding and freeze resulting freeze/spalling damage.Leave a comment:
-
Setting posts.....my method. Five to six bags of Sackrete per hole dry then just add water.
Rebar inserted through pipe about 20" from bottom of hole which is 48" deep.
Post Set.JPG
Will use a laser level to align the remaining four posts.Leave a comment:
-
Hey Bruce.....I'm posting a pic here that shows the 5 holes dug today to install a shoulder array. The new and third array will be East/West facing laying directly North/South. It will be a 24 panel array and will now create a total DC/AC ratio of 1.5.....nowhere near your 2.0 system. All three arrays will power two Fronius 7.5 string inverters ......I believe the same devices you have.
Those arrays in the background are 36 panels each Kyocera...front 235's and rear 245's....I call them my black and blue arrays. Black array in front producing since 2011 and blue in back producing since 2013. IronRidge mounting on 3" schedule 40 pipe......self installed. Break even and total ROI next year except now with the new investment I'm pushing it out another couple of years.
I'll post more pics as the array takes shape.
pictures and design details coming. Elevation angles, connections, curves, overall expectations.
No iron pipe here, no way to lift it. Every piece of mine is small enough that I could pick it up,
largest is 25 foot aluminum extrusion. My installer went for standard aluminum stock custom
drilled, and I made sure every last piece of hardware is stainless steel. There are 4 120 VAC
outdoor outlets on mine, good for tools and sometime lights for working on wiring at night.
After 5 years of watching and recording, there is a perhaps a final plan formed to keep the
maximum number of panels in the sun for the maximum number of hours. And avoid any more
massive tree removal. Stopped building with wood, am using concrete. Bought a small
trencher to connect things. More on that later. Bruce RoeLeave a comment:
-
Hey Bruce.....I'm posting a pic here that shows the 5 holes dug today to install a shoulder array. The new and third array will be East/West facing laying directly North/South. It will be a 24 panel array and will now create a total DC/AC ratio of 1.5.....nowhere near your 2.0 system. All three arrays will power two Fronius 7.5 string inverters ......I believe the same devices you have.
Those arrays in the background are 36 panels each Kyocera...front 235's and rear 245's....I call them my black and blue arrays. Black array in front producing since 2011 and blue in back producing since 2013. IronRidge mounting on 3" schedule 40 pipe......self installed. Break even and total ROI next year except now with the new investment I'm pushing it out another couple of years.
I'll post more pics as the array takes shape.
p.s. that is a gin and tonic in the foreground......because it got too hot to work. As my old neighbor used to say.....if you are doing it yourself always save a little bit to do tomorrow.
Shoulder Array #1.JPGLeave a comment:
Leave a comment: