Which is it 2 or 3? I fyou can give me some details like location, daily watt-hour consumption ican run th enumbers and see where you stand.
But if your system is working OK now without the batteries being drained indicates you are good shape. The tough months are December and January.
Most Popular Topics
Collapse
planning for the future
Collapse
X
-
You think C/10 is no good for me? My winter insolation rate is 2 - 3 minimum but is 3 - 4 average . I'm going for 2 days no sun maximum. If need be I've got a serious NO kidding generator if I get below 70% charged.Leave a comment:
-
MSEE = Master of Science in Electrical Engineering. A graduate college degree.
PE = Professional Engineer.Leave a comment:
-
Leave a comment:
-
Ok, Just couldn't figure out what MSEE or PE stands for. You seem to know what your doing, just wondering what expierience. no harm no fowl meant. Just wondering.Leave a comment:
-
Sunking is a very reputable guy in this industry and we are fortunate to have him here contributing to this board. Let's not run him off!Leave a comment:
-
I've got to disagree - a 12V battery is charged by a higher voltage, generally 14.5V. Sure, if a battery's' been drained to near death, the charging voltage will be lower, but an even finer point here is, there are no 150+ Amp MPPT chargers, the largest are 80A that I know of. 60A is a common limit for a charger.
For MPPT the charge voltage does not approach 14.5 volts until the very end of the charge cycle after the current tapers off to a C.03 rate. For charge voltage 13 to 13.8 is default number used
I agree. But you would be surprized how many DIY's try it cascading controller outputs to get the high amperage.Leave a comment:
-
Wrong wouldn't have one where I live. Electricity is cheap, no Net Metering laws, and no incentives.
I own my own architectural/engineering design firm. PE licensure, and 31 years of electrical generation, transmission, distribution, and battery plant behind me.
Think I covered that already
Well I assume you mean ones used for cycle service like those used in RE applications right? Of the 156 stand alone projects I have designed built never seen a set last more than 5 years before they loose 30% of their capacity.
Depends on the client and application. In the telcom sector at remote cell tower sites where power outages cannot be tolerated 10% DOD with back-up generators. Otherwise 20% is the default design.
Roughly about 6 years designing and building them mostly for telephone companies, and a few commercial projects like Walmart. Just finished up a design for a new Walmart in Plano TX with a 500 KW grid tied system.Leave a comment:
-
You do have a solar system right? Tell me what you've got. How long have you had it? How long has your battery bank lasted? What is your calculated D.o.D? How much experience do you have with solar? Pictures?Leave a comment:
-
The actual charge rate is determined by your location. A C/10 is a good rule of thumb, but may not be enough in some locations, and overkill in others.
Here is a good example. LetLeave a comment:
-
thanks mike that is a relief. just so you know, I would never doubt you.Leave a comment:
-
This is a reason many larger systems use 24 or 48V, at 12v, the currents are so large, they become impractical to deal with.
MikeLeave a comment:
-
Leave a comment:
-
Thanks Mike, I appreciate it. I'm looking at the links now.Leave a comment:
-
14.5V is a charging voltage for deep cyle batteries. As the batteries charge, the amps will slowly taper off, till the voltage steps up to increase the charge. The float charge is a lower voltage, and supplies little power into the battery.
Here's some links about Battery Equalization. If you don't have enough amps, you cannot get the eq process to begin working,
The Mighty Mini Compact All-In-One System offers an AC/DC Power Distribution Panel and Inteli-Power Converter with Charge Wizard battery charging technology.
Xantrex power products provide reliable power safely and efficiently, perfect for RVs, marine environments, commercial vehicles & more.
hope this helpsLeave a comment:
Leave a comment: