Originally posted by RKCRLR
View Post
If so, or in any case, I'd start the process for this question. Based on what you write, sounds (reads) like the sooner you ask, the sooner you'll get an informed response. Who knows, you might get lucky with an early response. Even if a late response and contrary to what you've done subsequently, at least you'll a.) not be surprised if the design fails to conform on inspection or, b.) if not inspected yet, be able to change the design.
For what is usually the small effort of a phone call/email, seems worth it to me to do so if for no other reason than covering my ass and being able to say, "I called and emailed you folks and never got a response - what was I supposed to do, stand around with tools in one hand and my best intentions in the other while I watch my bills increase and rebates decrease ? The clock is/was running, ya' know." Or something like that.
Comment