
Today, 02:49 PM
I am installing 40 modules with power optimizers which are to be run to a pair of central inverters in basement. My idea is to penetrate roof and run conduit down to basement. I'm reading that this would require EMT or some other type of metallic clad conduit... is this correct ?
I am am an electrician taking on this project on my own house.
Thanks !
Comment