Hello, Planning to install two arrays of 21 Jinko 400 W Panels using 2 Solar Edge 7600 Grid Tied Inverters. My current one line diagram is as follows: Meter base to 200 Amp Service Disconnect to 200 Amp Automatic Transfer Switch (for 22kw standby generator) to my 200 Amp Main Distribution Panel. I'm planning to connect the two inverts in between the 200 Amp Service Disconnect and the Automatic Transfer Switch. Each inverter will be have its own 40 amp over current protection device. What is the best way to achieve this connection?