Hi, I'm installing my rails xr-100 and Quickmount mounts on a difficult part of my roof. It's a valley that is slightly wider than the panels. I have 6 mounts for a 16.5 foot rail run. 3 mounts on each rail for a total of 6 mounts for 5 panels. Because the way the rafters run I had to put blocking in for 4 of 6 mounts. Ironridge docs say span can be as much as 8 feet in this zone. I have a max of 7 between mounts.
Do you think this is enough or should I add 2 more? we don't get that much wind, maybe a storm a few times a year. Most I have even seen is 50 mph. No snow. In the attached pic its #2 I'm working on.
Do you think this is enough or should I add 2 more? we don't get that much wind, maybe a storm a few times a year. Most I have even seen is 50 mph. No snow. In the attached pic its #2 I'm working on.