I need to control 4 wires, each individually running some 70 feet connecting panels. The black plastic
ties seem to be labeled as short lived, so what other options are out there? Sections of PV wire tied
around each? Bruce Roe
ties seem to be labeled as short lived, so what other options are out there? Sections of PV wire tied
around each? Bruce Roe
Comment