  • sensij
    replied
    Your battery based system will cost much more than power from the power company. Look at your numbers closely before buying anything. You might also want to learn the difference between a kW (kilowatt) and a kWh (kilowatt hour). It is an important distinction.

    Leave a comment:


  • russ
    replied
    Originally posted by Mike90250
    All work will need permits, and City and likely Utility inspections. EACH add-on of more panels/inverters requires new permits and inspections.

    If you don't own the property, the owner inherits the improvements. (Such a nice gift, thank you)
    This is the law most places - anything fixed to the property becomes part of the property - and belongs to the owner of that property - not you.

    Leave a comment:


  • Mike90250
    replied
    Whoa. Don't buy anything yet. Lets sort some stuff out first.

    Any large system will likely require mods to your main electrical panel.

    All work will need permits, and City and likely Utility inspections. EACH add-on of more panels/inverters requires new permits and inspections.

    If you don't own the property, the owner inherits the improvements. (Such a nice gift, thank you)

    Pure Grid Tie. No batteries to water or replace. No Charge Controller (no batteries to charge). The power you produce, gets used right at your house, any surplus unwinds your meter total. This system can save you money, with a 10 - 15 year payback. You can add a Transfer switch and backup generator for occasional power outages. PV runs at about 500VDC

    Pure Off-Grid Monthly battery watering. 5-10 year battery replacement schedule. Must plan with 90% perfection or you loose. (loose money and power). Weekly tinkering required. Careful (daily) monitoring of power levels required. Backup Generator required, 2 recommended. PV runs around 100VDC. Generally a 48V battery bank, managed by a Charge Controller. You (or someone living there) become the Power Plant Engineer.

    With either of the above systems, only the PV panels and racks are common to both. It's expensive to "change your mind".

    Hybrid System Much like Pure Off-Grid, with the option to sell any excess power to the Grid. The Hybrid Inverter costs more than either of the 2 previous system inverters. A transfer switch is needed, sometimes it's internal to the inverter.
    Only recommended if your power grid is notoriously unreliable with several long outages a month.
    Last edited by Mike90250; 01-18-2015, 12:05 AM.

    Leave a comment:


  • Im a newbie and i need help with planning my system

    Hello, my Name is Tyler and I'm from Ohio. Well I’m saving up for a solar system, at fist I would like this to be a grid tie, then work in a battery back up down the road and I have the numbers for what my finished product will need. I will be mounting these in a side yard; I most likely will not need help with the mounting of the panels. The only question I have for that would be, is it true that I want to slant my panels according to my latitude and longitude? Also if I’m trying to run my whole house should I go 24V or 48V? I know the higher voltage allows for less resistance threw the wires but that’s about all I have on that information.
    My Arrays will produce roughly 25,000w if my estimations are correct. I run about 3,000kw a month (There are many factors that go into this, I don’t own the house I’m in and I cannot make changes to anything that the house uses for sewage and the sub pump is only like 15gallons so it kicks on a lot. I also have a second family in this property, somewhat like a duplex) If I need 3,000kw = 3,000,000w that’s 100,000w a day for 30days, I live in Ohio so the average is 4.2 I like to round down on numbers like this so I went to 4 hours for 25,000w an hour. Are these calculations correct? I have worked with construction and rewiring (from breaker to rooms) in a few houses but I don’t know a lot about electricity. I would like to go with micro inverters but due to me having to get 125 panels (200w or 59 425w panel) it will get costly fast. My next question is can I have a pure sign wave inverter and have a few panels with micro inverters and just add on as I acquire more currency?
    Now to my charger controller questions. I read that each controller takes so many amps. So I read that to get the amps that your running you need to use this formula (amps=watts/volts). So If I need a system for about 32kw (25kw x .25=6,250 + 25kw= 31,250kw) and I take that with a 24v system its 1,303Amps? (For 24V its 652Amps) Would the amps be the same for the Inverter as well?
    Lastly I need to know where some people buy there equipment at, I have searched all over and I found some panels at a cheep price of .28/w and .48/w at http://sunelec.com/ there’s been some bad reviews of this place from the past but that was about 4 years ago and now they hold a A+ rating on another site I found. I would really like to get the panels for under $1/w if possible, or if there are any kits that will match my needs that would be great too. Thank you for all your time!