I am brand new to this and figure ill check with more informed.
I have 5 renogy 255 watt panel, 40 amp renogy controller.
I want to start by hooking up 4 of the 255 watt panels at 24 volt. They are 8.3 amp panels. I want to run these parallels into my c.c. I need to parallel them to keep volts down as the c.c. has enough amps. From the c.c. to 2 6v 215ah batteries. Ill get more as I can. From the batteries into a 2000w inverter.
Doss this all seem reasonable? Ill add more batteries every month in 2 packs.
As of now my bank will be 12 volt, but within two months I can create a 24 volt bank.
I'm in sc and get roughly 5 hours of son.
I need roughly 1200 watts a day
Thanks to anyone who finds time to respond.
I have 5 renogy 255 watt panel, 40 amp renogy controller.
I want to start by hooking up 4 of the 255 watt panels at 24 volt. They are 8.3 amp panels. I want to run these parallels into my c.c. I need to parallel them to keep volts down as the c.c. has enough amps. From the c.c. to 2 6v 215ah batteries. Ill get more as I can. From the batteries into a 2000w inverter.
Doss this all seem reasonable? Ill add more batteries every month in 2 packs.
As of now my bank will be 12 volt, but within two months I can create a 24 volt bank.
I'm in sc and get roughly 5 hours of son.
I need roughly 1200 watts a day
Thanks to anyone who finds time to respond.
Comment