charge controllers takes a long time to charge batteries
Collapse
X
-
-
I think he meant the Morningstar TS45 or TS60 (PWM) model.. they run $150-1901160 watts, Midnite 150 , Xantrex SW2000Comment
-
Comment
-
Comment
-
so i want to get a MPPT charge controller? is this a good charge controller?http://cgi.ebay.com/ws/eBayISAPI.dll...#ht_4142wt_724Comment
-
Yeah a little overkill but that is a good thing as it allows you to grow a bit in panel wattage is a Morningstar 45 amp model. About $150 to $200.
When I get my next controller for the 2nd array, it's going to be a Midnight ClassicPowerfab top of pole PV mount (2) | Listeroid 6/1 w/st5 gen head | XW6048 inverter/chgr | Iota 48V/15A charger | Morningstar 60A MPPT | 48V, 800A NiFe Battery (in series)| 15, Evergreen 205w "12V" PV array on pole | Midnight ePanel | Grundfos 10 SO5-9 with 3 wire Franklin Electric motor (1/2hp 240V 1ph ) on a timer for 3 hr noontime run - Runs off PV ||
|| Midnight Classic 200 | 10, Evergreen 200w in a 160VOC array ||
|| VEC1093 12V Charger | Maha C401 aa/aaa Charger | SureSine | Sunsaver MPPT 15A
solar: http://tinyurl.com/LMR-Solar
gen: http://tinyurl.com/LMR-ListerComment
-
Comment
-
so i want to get a MPPT charge controller? is this a good charge controller?http://cgi.ebay.com/ws/eBayISAPI.dll...#ht_4142wt_724
The sales pitch reads well.Powerfab top of pole PV mount (2) | Listeroid 6/1 w/st5 gen head | XW6048 inverter/chgr | Iota 48V/15A charger | Morningstar 60A MPPT | 48V, 800A NiFe Battery (in series)| 15, Evergreen 205w "12V" PV array on pole | Midnight ePanel | Grundfos 10 SO5-9 with 3 wire Franklin Electric motor (1/2hp 240V 1ph ) on a timer for 3 hr noontime run - Runs off PV ||
|| Midnight Classic 200 | 10, Evergreen 200w in a 160VOC array ||
|| VEC1093 12V Charger | Maha C401 aa/aaa Charger | SureSine | Sunsaver MPPT 15A
solar: http://tinyurl.com/LMR-Solar
gen: http://tinyurl.com/LMR-ListerComment
-
Comment
-
It comes down to economics. At around the 200 to 300 watt panel wattage level MPPT controllers are more economical because you do not need as much panel wattage.
Give you an example. Daily requirement = 600 watt hours, and winter insolation is 3 hours.
For PWM.
Panel wattage = 400 watts
PWM Amps = 25 Amps
For MPPT
Panel wattage = 300 watts
MPPT Controller = 25 amps.
Now go price it out with panels and controllers and see which is less expensive.MSEE, PEComment
-
Battery measrement.
Use a hydrometer or better still install a Trimetric or Pentametric battery monitor. It pays to watch your battery bank very carefully.Comment