    Saving

    How much have you saved since you converted to solar power?
  • Mike90250
    Moderator
    • May 2009
    • 16020

    #2
    I've spent over $90K for 5 Kw of PV that is producing 200 watts today Ouch, time to run the genset..
    Powerfab top of pole PV mount (2) | Listeroid 6/1 w/st5 gen head | XW6048 inverter/chgr | Iota 48V/15A charger | Morningstar 60A MPPT | 48V, 800A NiFe Battery (in series)| 15, Evergreen 205w "12V" PV array on pole | Midnight ePanel | Grundfos 10 SO5-9 with 3 wire Franklin Electric motor (1/2hp 240V 1ph ) on a timer for 3 hr noontime run - Runs off PV ||
    || Midnight Classic 200 | 10, Evergreen 200w in a 160VOC array ||
    || VEC1093 12V Charger | Maha C401 aa/aaa Charger | SureSine | Sunsaver MPPT 15A

    solar: http://tinyurl.com/LMR-Solar
    gen: http://tinyurl.com/LMR-Lister

    Comment

    • SunEagle
      Super Moderator
      • Oct 2012
      • 15123

      #3
      Originally posted by Mike90250
      I've spent over $90K for 5 Kw of PV that is producing 200 watts today Ouch, time to run the genset..
      Maybe it is time to move that off grid system to the mountains of Arizona.

      Comment

      • Mike90250
        Moderator
        • May 2009
        • 16020

        #4
        It's all that rain from climate change. But at least i don't have to clean panels
        Powerfab top of pole PV mount (2) | Listeroid 6/1 w/st5 gen head | XW6048 inverter/chgr | Iota 48V/15A charger | Morningstar 60A MPPT | 48V, 800A NiFe Battery (in series)| 15, Evergreen 205w "12V" PV array on pole | Midnight ePanel | Grundfos 10 SO5-9 with 3 wire Franklin Electric motor (1/2hp 240V 1ph ) on a timer for 3 hr noontime run - Runs off PV ||
        || Midnight Classic 200 | 10, Evergreen 200w in a 160VOC array ||
        || VEC1093 12V Charger | Maha C401 aa/aaa Charger | SureSine | Sunsaver MPPT 15A

        solar: http://tinyurl.com/LMR-Solar
        gen: http://tinyurl.com/LMR-Lister

        Comment

        • DanS26
          Solar Fanatic
          • Dec 2011
          • 966

          #5
          As of November 30, 2015 my accounting to date is as follows:

          Total Net Investment less Federal tax credits....$17,199.00 (does not include my labor cost)
          Total Cash Flow Project to Date including SREC credits of $1,197.83....$7,496.40
          Net Profit Project to Date (defined as Total Value of Solar Produced less Production Cost)......$4,151.56
          Return on Investment Project to Date....9.26%
          Estimated Payback.....6.4 years

          If I include the value of my internal labor the estimated payback would be 25.5 years and a negative ROI. If I had to pay someone to build or install my system it would not be viable.

          Comment

          • sdold
            Moderator
            • Jun 2014
            • 1424

            #6
            A year and a half ago I installed a 4 KW system, I paid $8,000 for all costs and received $2,400 back at tax time, so I'm $5,600 out of pocket. My average yearly power bills totaled $1,200 before that, but in the first year I over-generated slightly and broke even. So in the first year I didn't spend $1,200 for power that I would have otherwise.

            Comment

            • azdave
              Moderator
              • Oct 2014
              • 760

              #7
              I haven't "saved" anything yet but by the numbers I have under 7 years until I reach the break even point and then I'll be set through 2034 when I'll worry about my contract with the utility expiring. With just over a year elapsed since I purchased my system I've only sent my utility about $250 which is the minimum connection fee for my grid-tie system. I paying $200 more towards my mortgage each month with the "savings".
              Dave W. Gilbert AZ
              6.63kW grid-tie owner

              Comment

              • SunSolarPro
                Junior Member
                • Nov 2015
                • 21

                #8
                Originally posted by SunEagle

                Maybe it is time to move that off grid system to the mountains of Arizona.

                Always wanted to try that out!