However I am getting the sense that you don't want to do that.
I'm thinking I should be able to run the panels to a charge controller & inverter with a 110 or 220 outlet. I would then plug my 110 charging brick into the 110 outlet (and eventually to a 220 charger if this works).
If you want to do this independently of a grid, the only thing that really makes sense is to charge a battery then run off that. That gives you insulation from clouds and eliminates the problem of startup surges. Going this route you'd start the charge in the morning, the battery will discharge, the inverter will LVD, the battery will charge, and then it will start charging again. This will continue until solar power is sufficient to support 100% of the load, at which point it will charge continuously.
The smaller the battery, the faster it will cycle on and off. You could even do this with an ultracapacitor if you were so inclined.