Since you are on a net metering plan with one rate structure, month to month, with no carry over, then I think you are on the right track to try to maximize production in the lowest production months. Probably Dec thru Feb.
But you have to build a system that stays within the maximum size allowed by your coop and by the constraints of your electrical service on the highest production months. Probably Jun thru Aug.
Good luck....sounds like a fun planning exercise....at least to me.
Did you get pictures up of your E-W facing array? Bruce Roe
Comment