Could someone that is technically astute share the best practices of the shutdown and power up procedures for Solaredge inverters?
I see there are 3 shutoff switches:
1) Inverter red switch
2) DC Disconnect
3) AC Disconnect
I was warned not to throw the DC Disconnect switch while in production mode because that would be "bad" for the inverter and could damage it.
I see there are 3 shutoff switches:
1) Inverter red switch
2) DC Disconnect
3) AC Disconnect
I was warned not to throw the DC Disconnect switch while in production mode because that would be "bad" for the inverter and could damage it.
Comment