Hey Guys,
I'm curious what you think about housing the AC PV sub/combiner in the attic. This would allow me to combine all 5 sub arrays in the attic and run a single run of larger gauge wire to the AC disco and then to the line side connection. What are the pros/cons of doing this versus running the 5 sub-arrays down and then combining in the basement?
Thanks,
Bryan
I'm curious what you think about housing the AC PV sub/combiner in the attic. This would allow me to combine all 5 sub arrays in the attic and run a single run of larger gauge wire to the AC disco and then to the line side connection. What are the pros/cons of doing this versus running the 5 sub-arrays down and then combining in the basement?
Thanks,
Bryan