Did you check with your POCO if the will allow a panel upgrade? Is your service connected using underground cables or from a pole? For the former you don't want to find out half way through the project you need to dig a 50 foot long and 3 foot deep trench and run a new conduit in it just to be able to put in a 200A main panel. Speaking from experience.Comment
-
Thanks gvl! my service connected from a pole so hopefully not that bad. I am clueless about panel and what to ask so will have to read more, or ask the installer.Did you check with your POCO if the will allow a panel upgrade? Is your service connected using underground cables or from a pole? For the former you don't want to find out half way through the project you need to dig a 50 foot long and 3 foot deep trench and run a new conduit in it just to be able to put in a 200A main panel. Speaking from experience.Comment
-
What's the ampage of your current panel and the new one? If the new one is significantly larger, your POCO might force you to run new supply wires. While not as expensive as underground, it's still extra costs. I guess you will find out once you submit the permit application for the new panel to your POCO.16xLG300N1C+SE6000[url]http://tiny.cc/ojmxyx[/url]Comment
-
In my case SCE ran the wires for free once the new underground conduit was in place.What's the ampage of your current panel and the new one? If the new one is significantly larger, your POCO might force you to run new supply wires. While not as expensive as underground, it's still extra costs. I guess you will find out once you submit the permit application for the new panel to your POCO.Comment
-
Some pictures. The main shows 1 side 100 the other 80 or 90.What's the ampage of your current panel and the new one? If the new one is significantly larger, your POCO might force you to run new supply wires. While not as expensive as underground, it's still extra costs. I guess you will find out once you submit the permit application for the new panel to your POCO.
20150421_091611.jpg20150421_091744.jpg20150421_091804.jpgComment
-
Yeah those definitely need to be replaced, even without the solar. It's a fire hazard I would think. You might in luck as gvl pointed out, SCE may replace your supply line for free.16xLG300N1C+SE6000[url]http://tiny.cc/ojmxyx[/url]Comment
-
Company B has C-10 only, and company C has both C-10 & C-46. Any advantage having C-46?Comment
-
Comment
-
C-10 is sufficient, but having C-46 doesn't hurt either.
I've not familiar with either of the mounting HWs, but you can get a rough idea of the pricing from here http://www.civicsolar.com/products/racking-mounting Normally more expensive means better. The commonly trusted brands are Unirac, QuickMount and IronRidge with post stand-offs (not the hook type).16xLG300N1C+SE6000[url]http://tiny.cc/ojmxyx[/url]Comment
-
Thanks thejq!C-10 is sufficient, but having C-46 doesn't hurt either.
I've not familiar with either of the mounting HWs, but you can get a rough idea of the pricing from here http://www.civicsolar.com/products/racking-mounting Normally more expensive means better. The commonly trusted brands are Unirac, QuickMount and IronRidge with post stand-offs (not the hook type).Comment
-
I also went with company "B" and had my panel upgraded (Eaton). Smaller system, 4.59kW.
Ran into a few roof issues - I had to get a new roof
but they did great work.
Comment
-
Thanks OftheSeven! Could you pm me your roofer's information? My roof may need to be done too. Thanks again!Comment
-
Comment
-
Comment
Copyright © 2014 SolarReviews All rights reserved.
Powered by vBulletin® Version 6.1.3
Copyright © 2025 MH Sub I, LLC dba vBulletin. All rights reserved.
Copyright © 2025 MH Sub I, LLC dba vBulletin. All rights reserved.
All times are GMT-5. This page was generated at 06:24 PM.
Comment