Just received our first quote for a 10.7 kW DC PV solar system that according to the installer has an estimated annual kWh production of 17,384 ... We have a two story house with no shade issues... Roof has a southwest orientation...
Our current power usage is 1,000 KHW per month (before PV) and will increase to 1,750 KWH per month with the addition of a recently ordered electric car.
The $50,750 proposal is as follows:
31 Sunpower X21/345 panels
1 SolarEdge SE10000A-US inverter (single phase)
31 SolarEdge P400 power optimizers (instead of using microinverters)
Monitoring is via the SolarEdge portal.
Does anyone have an experience with SolarEdge as a company? What about the use of power optimizers vs. microinverters? Based on my research, this sounds like an ongoing debate...
Final question, what's the rule of thumb for calculating the cost per KHW hour? I know Sunpower panels are more expensive but is this proposal reasonable from a cost per KHW hour?
Thanks for your feedback / advice...
Our current power usage is 1,000 KHW per month (before PV) and will increase to 1,750 KWH per month with the addition of a recently ordered electric car.
The $50,750 proposal is as follows:
31 Sunpower X21/345 panels
1 SolarEdge SE10000A-US inverter (single phase)
31 SolarEdge P400 power optimizers (instead of using microinverters)
Monitoring is via the SolarEdge portal.
Does anyone have an experience with SolarEdge as a company? What about the use of power optimizers vs. microinverters? Based on my research, this sounds like an ongoing debate...
Final question, what's the rule of thumb for calculating the cost per KHW hour? I know Sunpower panels are more expensive but is this proposal reasonable from a cost per KHW hour?
Thanks for your feedback / advice...