Hello, I am investigating a solaredge 10k watt grid tie in system for my home. I currently have a 2 - 200 amp service supply from the utility company, one for my house and one for my garage. I am being informed that I can only use a 40 amp backfeed breaker in my 200 amp breaker panel. And to maximum the 10k watt system I need a 60amp backfeed breaker. So I either need to upgrade my service to a larger capacity service or break the system in 2 and feed in into my house panel and the second one into the other separate service that feeds my garage.
I would really like to get rid of the service to my garage and feed it from the panel in my house. I have been searching and cannot find a solution on how to tie in the 10k watt solar into my service panel.
I did read something about a fuse disconnect and distribution panel located next to the meter box as a possible option. but at this point I am confused on how this should tie into my existing 200 amp service.
Thanks in advance for any assistance to helping me understand how this all ties together.
Thanks, Dave
I would really like to get rid of the service to my garage and feed it from the panel in my house. I have been searching and cannot find a solution on how to tie in the 10k watt solar into my service panel.
I did read something about a fuse disconnect and distribution panel located next to the meter box as a possible option. but at this point I am confused on how this should tie into my existing 200 amp service.
Thanks in advance for any assistance to helping me understand how this all ties together.
Thanks, Dave
Comment