I had my rooftop array installed in Massachusetts 2 years ago (mid 2015). I have all the rapid shutdown switches & inverter external to the house.
Question.... Does the rapid shutdown de-energize the panels themselves, or only the conduits to the inverter and to the main AC panel? Thinking about first responders in the event of a fire during the day.
Question.... Does the rapid shutdown de-energize the panels themselves, or only the conduits to the inverter and to the main AC panel? Thinking about first responders in the event of a fire during the day.
Comment