Hello guys ... hopefully an easy question.
My plumbing/vent roof protrusions .. although not many ... are placed where I have to place panels
in between them. Is it kosher to run the mounting rails continuous and place the panels two feet apart (two feet of railing would be exposed).... or would this be considered a trip hazard? It seems grounding would be easier that way also.
Thanks.
My plumbing/vent roof protrusions .. although not many ... are placed where I have to place panels
in between them. Is it kosher to run the mounting rails continuous and place the panels two feet apart (two feet of railing would be exposed).... or would this be considered a trip hazard? It seems grounding would be easier that way also.
Thanks.
Comment