Announcement

Collapse
No announcement yet.

mounting panels to treated-wood frame

Collapse
X
 
  • Filter
  • Time
  • Show
Clear All
new posts

  • #91
    Looks good to me. I did not bother with any concrete on my 5 year expectation, treated wood
    array (still looking decent at 7 years). The front and back posts are connected together at the
    40 inch depth by braces, it is going nowhere. No lateral bracing on any of my first arrays, the
    panels are supposed to stiffen them.

    My treated wood is held together with hot dipped galvanized bolts, no lag bolts. I was
    able to keep a hole through a 2 x 6 centered by pre drilling almost everything on a drill press.
    Bruce Roe
    Last edited by bcroe; 05-19-2020, 12:35 PM.

    Comment

    Working...
    X