I realized that I cant mount the combiner box where the plans specify it will be mounted. And instead I want to mount it on another wall, is the inspector going to have a problem with that? Or is that one of those things thats understandable if things deviate a little? (assuming other rules arent broken, like disconnect still being within 10 feet and visual distance of breaker panel etc).?
Red is location specified on the plans, green is location I want to mount it. - https://imgur.com/a/HXilY2u