Probably a redundant question these forums, but I shall ask anyways.
Ungrounded SolarEdge Inverter w/ Optimizers. From Inverter to AC disconnect ( whether knifeswitch or Breaker) you have your 4 wires.
You are Tapping with an Insulation-piercing Tap Connector on the Load side of the meter. In the meter can, which would tell you it is the Line side of the main Breakerbox.
Do you land the Neutral to Ground, or install a seperate busbar for the ground wire coming from the inverter.
If you land them seperate. Do you run a ground into the meter can and land it directly on the #4 Bare, or the second termination point( depending on the Brand) on the Neutral lug.
Ungrounded SolarEdge Inverter w/ Optimizers. From Inverter to AC disconnect ( whether knifeswitch or Breaker) you have your 4 wires.
You are Tapping with an Insulation-piercing Tap Connector on the Load side of the meter. In the meter can, which would tell you it is the Line side of the main Breakerbox.
Do you land the Neutral to Ground, or install a seperate busbar for the ground wire coming from the inverter.
If you land them seperate. Do you run a ground into the meter can and land it directly on the #4 Bare, or the second termination point( depending on the Brand) on the Neutral lug.