runnig a solar system w/o notifying the utility
Collapse
X
-
-
Which brings us to the future "solution" of the smart inverter which can be commanded remotely to reduce its output. Kind of the opposite of the remote shedding of interruptible loads when demand goes too high.
Among other things it would do wonders for the stability of the network in the medium term and would spread the losses for occasional PV generating capacity uniformly across all of the legal users.SunnyBoy 3000 US, 18 BP Solar 175B panels.Comment
-
Which brings us to the future "solution" of the smart inverter which can be commanded remotely to reduce its output. Kind of the opposite of the remote shedding of interruptible loads when demand goes too high.
Among other things it would do wonders for the stability of the network in the medium term and would spread the losses for occasional PV generating capacity uniformly across all of the legal users.Comment
-
PGE sent a email stating I was approved to run the system and be in the Net Energy Metering program. For all of you out there it took me 20 days from the time of submittal to approval. Not exactly a streamline process but when your dealing with a Monopoly Utility what do you expect. Happy Happy Happy to be up and running and pushing power to the grid in the afternoons.Comment
Copyright © 2014 SolarReviews All rights reserved.
Powered by vBulletin® Version 6.1.0
Copyright © 2025 MH Sub I, LLC dba vBulletin. All rights reserved.
Copyright © 2025 MH Sub I, LLC dba vBulletin. All rights reserved.
All times are GMT-5. This page was generated at 11:57 AM.
Comment