Hi there,
I am an inspector, and on a PV job I was looking at the other day, all the wiring was left lying on the roof surface. The roof was near-flat, with a painted-on-metal finish. The array was quite low, perhaps 4" off the surface.
I am quite clear that this is not optimal, but actual code is a bit less definitive: I think it comes down to "workmanlike manner" language.
Anyway, I'd be interested in hearing other's opinions of how important this detail is.