Semi-new to solar and looking for some advice! (Had a Sunpower grid-tie lease, but now looking to do something more complicated)
I would like to install a 10+kw sunny boy system + a sunny island setup for load shedding and power outages.
I've got 1,000 sq ft of non-shaded flat roof, which per the pvwatts page says 12kw using 15% efficiency panels. Should I put all of these panels on a single large sunny boy, or should I split them on to two inverters?
I've also allocated space for a pair of sunny islands + batteries, however, is it possible to program them to load shed on a grid tied system during say 12PM-9PM? During a power outage I would also need it to become an island for critical loads.
Thanks in advance!
I would like to install a 10+kw sunny boy system + a sunny island setup for load shedding and power outages.
I've got 1,000 sq ft of non-shaded flat roof, which per the pvwatts page says 12kw using 15% efficiency panels. Should I put all of these panels on a single large sunny boy, or should I split them on to two inverters?
I've also allocated space for a pair of sunny islands + batteries, however, is it possible to program them to load shed on a grid tied system during say 12PM-9PM? During a power outage I would also need it to become an island for critical loads.
Thanks in advance!
Comment