When Enron owned the project, for a couple of years before they went down, the sales guys in Portland, OR ran operations. They would have the turbines turning below critical speed to conserve water and when they got the 1000$ per MWh sale they would have them running up against the over speed trips.
The power house people said the entire dam would be vibrating at that point.