It's also cool that you are getting upgrades for at no additional cost.
Yes, I have everything to complete my system, including the M215's and the LG280 Panels, and the racking system. The original plan was to install the whole thing earlier this year. But it got hot and I had to stop. As it was, it took me a weeks, up at first light, and working until I was ready to drop each day. This way, I have a project for fall.
How many panels are you getting? I know you told me before, that I have slept several times since then. It is great that you can get them all on south facing roof. That way you will get the most out of them.
Yes, I have everything to complete my system, including the M215's and the LG280 Panels, and the racking system. The original plan was to install the whole thing earlier this year. But it got hot and I had to stop. As it was, it took me a weeks, up at first light, and working until I was ready to drop each day. This way, I have a project for fall.
How many panels are you getting? I know you told me before, that I have slept several times since then. It is great that you can get them all on south facing roof. That way you will get the most out of them.
Comment