Assume I have a battery bank comprised of 8 * 6V 400AH batteries wired in series for 48 volts.
Assuming that I can run it down to 50% DOD then my total watt hours is: 48*400/2 = 9600 watt hours
And then if I need to power a 2000 watt load, it would last 9600/2000 = 4.8 hours assuming no losses.
So is this basically correct?
Assuming that I can run it down to 50% DOD then my total watt hours is: 48*400/2 = 9600 watt hours
And then if I need to power a 2000 watt load, it would last 9600/2000 = 4.8 hours assuming no losses.
So is this basically correct?