In the end we never had a problem with the inspector. I suggest just wiring it for solar and and generator but not hooking up. There's nothing in the code about having it wired but no power feed to the panel
Try our solar cost and savings calculator
Electrical inspection and new off-grid cabin build
Collapse
Copyright © 2014 SolarReviews All rights reserved.
Powered by vBulletin® Version 6.1.0
Copyright © 2025 MH Sub I, LLC dba vBulletin. All rights reserved.
Copyright © 2025 MH Sub I, LLC dba vBulletin. All rights reserved.
All times are GMT-5. This page was generated at 11:34 AM.
Comment