Hi All,
I've got two pole-mount PV arrays that need earth grounding. I will be changing panel angle four times a year on these poles. I need a method to go from solid, fixed ground cable on the pole to the solid, fixed ground cable (weeb) on the movable panel array. Should I use some kind of braided copper cable to allow for the moment of the PV assemblies?
One other thing. I was watching a you-tube video about code for grounding panels. They said that allowances for ground rods at the panels had been removed sometime around 2008/2010. This method really appeals to me. Even though this method is not now expressly listed, does that mean it's not allowed?
Sure would appreciate any insight .....
I've got two pole-mount PV arrays that need earth grounding. I will be changing panel angle four times a year on these poles. I need a method to go from solid, fixed ground cable on the pole to the solid, fixed ground cable (weeb) on the movable panel array. Should I use some kind of braided copper cable to allow for the moment of the PV assemblies?
One other thing. I was watching a you-tube video about code for grounding panels. They said that allowances for ground rods at the panels had been removed sometime around 2008/2010. This method really appeals to me. Even though this method is not now expressly listed, does that mean it's not allowed?
Sure would appreciate any insight .....
Comment