I figured everything out and ordered my system. Thanks for all the advice. You guys have been very helpful.
I don't just rely on advice here since a lot of times it is conflicting. I have checked everything with code, Midnight Solar tech, Schneider tech and lots of research so I am good to go.
I learned years ago not to rely on just one person even if they are licensed in their trade. I had an electrician install a subpanel when I finished my basement. Subpanel was right next to the main panel. He bonded the neutral bus to ground in the subpanel even though the main panel was bonded. He sort of knew what he was doing since he kept the neutrals and grounds separate. He didn't run a ground wire from the main panel. It cost me about $5 in wire to fix his mistake.
I don't just rely on advice here since a lot of times it is conflicting. I have checked everything with code, Midnight Solar tech, Schneider tech and lots of research so I am good to go.
I learned years ago not to rely on just one person even if they are licensed in their trade. I had an electrician install a subpanel when I finished my basement. Subpanel was right next to the main panel. He bonded the neutral bus to ground in the subpanel even though the main panel was bonded. He sort of knew what he was doing since he kept the neutrals and grounds separate. He didn't run a ground wire from the main panel. It cost me about $5 in wire to fix his mistake.
Comment