My load is 4 x 50 w and 3 x 8 w lights on a day/night switch: 224 w (<20a) x 13 hrs = 260 amps used
My system is 3 x 200w mono panels in parallel connected via 15 mtrs. 4mm dia cable to a 40 amp PWM controller,
controller connected to 4 x 100a/h 12v gel batteries giving 200a/h @ 24v. connected to a 600w pure sine inverter
My problem is that I only have enough power for one night and a few hours and takes over two days to charge up.
I have already bought a 30 amp MPPT controller which is rated max PV input power 390w @ 12v/780w@24v
I understand that I will need 2x100a/h 12v batteries to give me 100a/h 24v extra back-up.
My question are, do I need an extra panel to go in series to give more amps, will my new controller handle it,
I am confused by the wattage rating on the MPPT controller it seems that it will not handle 4 x 200 w panels
Any comments would be appreciated p.s. be gentle with Me... I am a newbie.
My system is 3 x 200w mono panels in parallel connected via 15 mtrs. 4mm dia cable to a 40 amp PWM controller,
controller connected to 4 x 100a/h 12v gel batteries giving 200a/h @ 24v. connected to a 600w pure sine inverter
My problem is that I only have enough power for one night and a few hours and takes over two days to charge up.
I have already bought a 30 amp MPPT controller which is rated max PV input power 390w @ 12v/780w@24v
I understand that I will need 2x100a/h 12v batteries to give me 100a/h 24v extra back-up.
My question are, do I need an extra panel to go in series to give more amps, will my new controller handle it,
I am confused by the wattage rating on the MPPT controller it seems that it will not handle 4 x 200 w panels
Any comments would be appreciated p.s. be gentle with Me... I am a newbie.