Looking to move from two lead acid batteries to one lifePo4 and want to cut down on connections. Using appropriate breakers/fuses, can I take my roof solar, solar on the side, and inverter connections and run to a positive and negative bus bar and then one wire to the battery terminals? Just confused on current flow and whether the inverter and solars would be working against each other.
Try our solar cost and savings calculator
Bus bar usage
Collapse
X
Copyright © 2014 SolarReviews All rights reserved.
Powered by vBulletin® Version 6.1.0
Copyright © 2025 MH Sub I, LLC dba vBulletin. All rights reserved.
Copyright © 2025 MH Sub I, LLC dba vBulletin. All rights reserved.
All times are GMT-5. This page was generated at 06:40 PM.