I'm curious what a proper panel has for a label. Curious aside from the aforementioned requirement for labeling the panels what a proper panel certification looks like.
I say that because there's an awful large load of Chinese panels flooding ebay, etc and maybe they're all certified to some yet-to-be-identified standard, and maybe they just list the performance criteria as detailed in the NEC.
Maybe you guys would say all these panels are destined for hobbyists.
And I always said these DIY panels might price themselves out of reality. But that would be for me to decide, eh?
Try our solar cost and savings calculator
DIY solar panels
Collapse
X
-
My comments about UL Labs are completely factual. If there's something you know to be specifically incorrect, please point that out.Leave a comment:
-
I already suggested for him to refer to his home owners insurance. Although if the pv system is not on his house and if the connection is approved by the inspector (I'll believe that when he tells me) the insurance company my not give a rats ass about it and say go for it. I know mine would care very much and disallow any DIY equipment.Leave a comment:
-
I realize you two are trying to help...
I will say that I've been directed to much more specific info than anywhere else, and I will say again that I'm grateful.Leave a comment:
-
Leave a comment:
-
Anywho- the only corner cutting I'm considering is assembling the panels. After that, M215 Enphase micro inverters and all the goodies.
And I may yet find that building panels is cost prohibitive. I just wanted the freedom to do so if I wanted.
Probably looking at 60 panels. Three rows, two high. Typical 3x5 panels with 6x6 cells. I'd likely start with one row.Leave a comment:
-
Anywho- the only corner cutting I'm considering is assembling the panels. After that, M215 Enphase micro inverters and all the goodies.
And I may yet find that building panels is cost prohibitive. I just wanted the freedom to do so if I wanted.
Probably looking at 60 panels. Three rows, two high. Typical 3x5 panels with 6x6 cells. I'd likely start with one row.
Have at it. The world is full of nonsense.Leave a comment:
-
I disagree with the UL comments. They are the MOST profitable private lab in the US. They charge 2-3 times what other labs charge. I can cite many examples. Other labs are not a crap shoot as all labs are simply testing to a standard. The Non-profit status i simply a tax thing. Now it's clearly a marketing thing, too. Don't assume any benevolence with this lab
No inspector can lawfully hold up a job because of a test report from a lab other than UL. Completely a win-able situation and I have myself been there before. If an accredited (NVLAP) facility tests a product to be in compliance with a particular building standard that is the end of the story.
If there are indeed gray areas then I can see the AHJ can make a call. My AHJ says go.
I do appreciate your quotes from the NEC.Leave a comment:
-
Again all must equipment and material SHALL BE LISTED and Approved by the AHJ.
There two rules when working with the AHJ you must comply with no questions asked.
1. AHJ is always right.
2. When AHJ is incorrect refer to rule #1
From NEC again:
Labeled. Equipment or materials to which has been attached
a label, symbol, or other identifying mark of an
organization that is acceptable to the authority having jurisdiction
and concerned with product evaluation, that maintains
periodic inspection of production of labeled equipment
or materials, and by whose labeling the manufacturer
indicates compliance with appropriate standards or performance
in a specified manner.
Listed. Equipment, materials, or services included in a list
published by an organization that is acceptable to the authority
having jurisdiction and concerned with evaluation
of products or services, that maintains periodic inspection
of production of listed equipment or materials or periodic
evaluation of services, and whose listing states that either
the equipment, material, or service meets appropriate designated
standards or has been tested and found suitable for
a specified purpose.
Approved. Acceptable to the authority having jurisdiction.
Authority Having Jurisdiction (AHJ). An organization,
office, or individual responsible for enforcing the requirements
of a code or standard, or for approving equipment,
materials, an installation, or a procedure.
That means the AHJ has full authority to tell you and/or your contractor what is acceptable or not. Every AHJ recognizes UL. All others are a Crap Shoot.Leave a comment:
-
I SO hear you regarding the gov influence...
Anywho- the only corner cutting I'm considering is assembling the panels. After that, M215 Enphase micro inverters and all the goodies.
And I may yet find that building panels is cost prohibitive. I just wanted the freedom to do so if I wanted.
Probably looking at 60 panels. Three rows, two high. Typical 3x5 panels with 6x6 cells. I'd likely start with one row.Leave a comment:
-
That's a great link and I'm grateful for it. It lists UL 1703 as a test they provide. Again, this is a private for-profit lab, and this is their test they offer for a fee.
In and of itself, this simply means a private lab (UL) has a standard they came up with to test something. This by itself does not mean that the NEC or MRC requires such a test, or that there is even a standard that code requires. I still cannot find such a standard.
As a side note, with the lab testing world, UL is known to me a big monopolizing bully. It is not in any way associated with the US govt, which consumers (not referring to the tradespeople here) often are led to believe.
hahahaha! 'big monopolizing bully' Look to your government for that. They will protect us all into the grave. UL would not exist without the guvment's demand. Of course UL wants a fee, just like your government wants it's taxes just for your existence in their jurisdiction.
You may consider UL a bully but they are THE standard recognized in USA by AHJs everywhere. I don't consider UL to be bully at all, worked with them in the past to have some of my products tested and found them all to be good people with the expertise, tools and facilities needed for accurate testing... which is why they are recognized as the standard for safety. They're easy to work with if you know what your doing.
If you are going the DIY route with solar panels you might be wise to consider their standards and build accordingly... if you can. Just how many panels will your proposed system employ anyway? All your posts about cutting corners, not needing approval... have you considered the time it will take you to build a decent supply of panels for a useful grid tie system?
good luckLeave a comment:
-
That's a great link and I'm grateful for it. Thank you.
It lists UL 1703 as a test they provide. Again, this is a private for-profit lab, and this is their test they offer for a fee.
In and of itself, this simply means a private lab (UL) has a standard they came up with to test something. This by itself does not mean that the NEC or MRC requires such a test, or that there is even a standard that code requires. I still cannot find such a standard.
As a side note, with the lab testing world, UL is known to me a big monopolizing bully. It is not in any way associated with the US govt, which consumers (not referring to the tradespeople here) often are led to believe.Leave a comment:
-
Leave a comment:
-
Met with the electrical inspector. He handles three counties and there a lot of solar going on, so he's pretty comfortable talking about this. He had the NEC and MRC flipping through while we spoke.
His opinion:
#1- If the panels are in a field (as I have planned) then you can build your own panels. He's sending me a letter to confirm. Same with a water wheel, wind turbine, or squirrels on wheels. It's the inverter and after that is relevant.
#2- In his understanding, the above changes if you attach panels to a house. In his understanding the Michigan Residential Code comes into play, which he recalled asks for a testing label. He could not find this requirement listed anywhere, and was not aware as to what standard the test would be measuring compliance to. A lab only tests to a standard. Like an ASTM standard, IEEE, etc. A lab can't just randomly run a few tests and apply a label saying "OK". Any lab test is only to verify conformity to a standard, and it is that exact (PV Panel) standard that no one can identify.
Even though I have a green light on DIY panels installed in a field array, I am continuing to drill into the the house attachment component. If there's no standard, then there's no test that could be performed, and so no test required.Leave a comment:
-
I'll ask him but when they're saying identified and listed that is referring to the schematic that you have to provide and list. That is not to say certify, test, or otherwise provide test documentation. In many areas of the NEC and the Net Metering application it asks to have the system components listed (on an application).Leave a comment:
Copyright © 2014 SolarReviews All rights reserved.
Powered by vBulletin® Version 6.1.0
Copyright © 2025 MH Sub I, LLC dba vBulletin. All rights reserved.
Copyright © 2025 MH Sub I, LLC dba vBulletin. All rights reserved.
All times are GMT-5. This page was generated at 02:59 PM.
Leave a comment: