Next week supposedly all California cities are required to speed up solar permitting a bit:
Try our solar cost and savings calculator
"SunShot Prize: Race to 7-Day Solar" started yesterday
Collapse
X
-
Here in the US every town county and state have different requirements. Utilities vary from 3 days to 3 months for PTO
Inspections generally 2 days of waiting as electric has to come first and then building ( have no idea why building cimes out all they ever ask for is if the electric passed and maybe count the collectors.)
7 days would be like a dream come trueLeave a comment:
-
Leave a comment:
-
The US clearly has some catching up to do. I think Solar Pete was rubbing it in
Leave a comment:
-
No, Sunshot is just a U.S.A. program. You Aussie's already have ez install / low cost solar.Leave a comment:
-
Since it is being funded by the US DOE, I would say off shore installers need not apply.Crickey, is this open to non us residents? We have a good system in OZ thats all online and takes about 5 mins to get an approval to install number, then we have to book a meter change over or reprogram and we are done, this is for a standard install on a roof, ground mount or tilt frames require more work, engineering etc
I wish there could be more interest by installers in Florida but our POCO's have the state pretty much locked up.Leave a comment:
-
Crickey, is this open to non us residents? We have a good system in OZ thats all online and takes about 5 mins to get an approval to install number, then we have to book a meter change over or reprogram and we are done, this is for a standard install on a roof, ground mount or tilt frames require more work, engineering etchttp://energy.gov/eere/sunshot/sunsh...ce-7-day-solar
"GOAL AND PRIZES
Reduce permit-to-plug-in times towards seven days for PV systems ≤100kW (small system contest) or seven weeks for PV systems ≤1 MW (large system contest) and win cash prizes totaling $10 million."
Competition just started; first progress report due Jan 19, 2016.
One of the teams is even aiming for same-day solar installation and permitting. May as well aim high, I guess.Leave a comment:
-
All right! Go Sunshot! this is what we need. I could drop my pricing dramatically if the interconnect process was only 7 days. Could get to a 5 year payback I think - and that would really open up the solar market to a lot of people that can't justify it now. However, most of the building departments we work in still take a month to do the permit and the local utility (APS) is currently "overloaded" with solar applications and is taking 2 months to get the paperwork "approved". We spend half our manhours creating paperwork, pushing paperwork, and checking on paperwork. Please, can the authorities just trust us licensed, bonded, insured, and certified installers to do our job without all the oversight?Leave a comment:
-
"SunShot Prize: Race to 7-Day Solar" started yesterday
http://energy.gov/eere/sunshot/sunsh...ce-7-day-solar
"GOAL AND PRIZES
Reduce permit-to-plug-in times towards seven days for PV systems ≤100kW (small system contest) or seven weeks for PV systems ≤1 MW (large system contest) and win cash prizes totaling $10 million."
Competition just started; first progress report due Jan 19, 2016.
One of the teams is even aiming for same-day solar installation and permitting. May as well aim high, I guess.
Copyright © 2014 SolarReviews All rights reserved.
Powered by vBulletin® Version 6.1.3
Copyright © 2026 MH Sub I, LLC dba vBulletin. All rights reserved.