the pump is resting aat 76 meters.
Permit
Collapse
X
-
-
you probably need your own thread instead of taking over on on permits.
10kva is roughly 9kw. I would assume the pump is not using all the power from the genset. 3.5hp is roughly 2.6kw so your answer is someplace between 3kw and 9kw.
you would need some batteries as well and an inverter capable of the power needs for the pump.
OutBack FP1 w/ CS6P-250P http://bit.ly/1Sg5VNHComment
-
That will cost you a lot of money which could be used to purchasing fuel for that 10kva genset.Comment
-
Comment
-
at http://santaclaraca.gov/government/d...and-outs-forms
click on "Residential Solar Photovoltaic System Guidelines"
Your city may have similar - And they may be willing to show you an approved permit (or tell you what else is needed if you bring the above example or your own system done to the same level)Comment
-
Comment
-
County is very easy. My brother did a package similar to what he did but the city inspector ( I'm not actually in Fresno but a small city in the county) wasn't so accepting. He was very nice about it and helpful but I don't want to be that guy who has to keep coming back and bugging him. I work a lot of hours so I decided I would just pay someone to do that part, lol yea not so easy so far. I am in the middle of doing my drawings and such as I type. I have found some really good info since I started this thread. I am on staycation for the next two weeks so the plan is to be done by the time I go back to work.Comment
Comment