Guys,
Got my system inspected and signed off today
. Pictures and install details coming. I just submitted Southern California Edison NEM application paperwork today. Based on what I read on SCE website receiving PTO will be a while.
My system has been sitting with DC Disconnect Off, AC Disconnect Off, and my Main C/B off for a week. The only confirmation I know it is working is me measuring 500VDC coming from my panels. I have 8x Sunpower E20 327 with Voc at 65V.
Question – can I test run my system before PTO from SCE? Is there a chance I will damage my meter and be liable for it before SCE issues PTO? Does Edison do anything to the meter when they issue the PTO? I do have a smart meter, and I will only be pushing 12A at 240VAC max.
Tomas
Got my system inspected and signed off today

My system has been sitting with DC Disconnect Off, AC Disconnect Off, and my Main C/B off for a week. The only confirmation I know it is working is me measuring 500VDC coming from my panels. I have 8x Sunpower E20 327 with Voc at 65V.
Question – can I test run my system before PTO from SCE? Is there a chance I will damage my meter and be liable for it before SCE issues PTO? Does Edison do anything to the meter when they issue the PTO? I do have a smart meter, and I will only be pushing 12A at 240VAC max.
Tomas
Comment