Is it just me or did anyone see the issue concerning the multiple strings of wire in his diagram? hollywoodtoday solar sys pic.jpg
From the panels + terminal (1 -#6 & 3-#12), from panels - terminal (1 -#4 & 3 - #12), to the inverter + & - terminal (1 - #2 & 2 - #12). The electric code does not allow you to run different gauge wires in parallel.
Also that inverter he listed is looking for 48VDC input yet the OP has a 24V battery system.
This whole system is an accident waiting to happen. Someone please get him to STOP NOW.
From the panels + terminal (1 -#6 & 3-#12), from panels - terminal (1 -#4 & 3 - #12), to the inverter + & - terminal (1 - #2 & 2 - #12). The electric code does not allow you to run different gauge wires in parallel.
Also that inverter he listed is looking for 48VDC input yet the OP has a 24V battery system.
This whole system is an accident waiting to happen. Someone please get him to STOP NOW.
Comment