Hi guys,
Just returned from Orlando, The battery on the small pond solar system seem need EQ. My helper told me last week after a cloudy day the inverter trip off in the morning when she come to work, I told her to turn off the inverter and plug the pump to the house system. after about 4 days bright sun without any consumption the battery still not fully charged, actually the SG reading on 3 of the 4 batteries are below 1,200. I think I need to do thoroughly EQ on these batteries to see if any different.
My question is, if I don't want to use the generator or the grid (actually I have problem to use the grid as the inverter in this system doesn't have a charger, and the new charge I got I don't think it have the EQ feature).
Can I charge the batteries in one day with a charge controller with higher voltage and continue the next day without using the batteries? I can separate the two bank and charge one bank at a time and the other another time. if the EQ can't finished one day, can I continue the next day? with out discharge it or I have to make it run through without stop?
Thank you.
Just returned from Orlando, The battery on the small pond solar system seem need EQ. My helper told me last week after a cloudy day the inverter trip off in the morning when she come to work, I told her to turn off the inverter and plug the pump to the house system. after about 4 days bright sun without any consumption the battery still not fully charged, actually the SG reading on 3 of the 4 batteries are below 1,200. I think I need to do thoroughly EQ on these batteries to see if any different.
My question is, if I don't want to use the generator or the grid (actually I have problem to use the grid as the inverter in this system doesn't have a charger, and the new charge I got I don't think it have the EQ feature).
Can I charge the batteries in one day with a charge controller with higher voltage and continue the next day without using the batteries? I can separate the two bank and charge one bank at a time and the other another time. if the EQ can't finished one day, can I continue the next day? with out discharge it or I have to make it run through without stop?
Thank you.